Skip to main content
Top-Loader Bracket Install Guide
T
Written by Taylor
Updated over 8 months ago

ALWAYS POWER DOWN MACHINES THROUGHOUT DEVICE INSTALLATION.

Please reference the general Penny and Pulse Installation guides found below:


This guide includes information specific to mounting Top-Loader brackets and associated Penny devices. Consult machine specific configuration guides for further information on programming, harness connections, and other questions.

Required Materials

  1. Penny device

  2. Top-Loader Bracket Assembly (76-01358)

    1. Base Plate (10-01302)

    2. Top Bracket (10-01303)

  3. #6-32 x 1/4" T10 Screws qty 8 provided

  4. #6-32 x 1/2" T10 Screws qty 4 provided

Purchasing the Cents Install Kit is optional but recommended.

Installation Steps

Alliance (SpeedQueen/Huebsch) Top-Loader machines use a top-mounted coin box. The Penny device will mount on top of this coin box.

  1. Apply the provided drill guide sticker to the top of the coin box vault door.

  2. Using the provided drill bit, drill the (4) mounting holes for the bracket. Using the provided hole saw, drill the central hole to route the harness.

  3. Using the #6 screws and lock washers, mount the base plate of the bracket, P/N: 10-01302.

  4. Remove the front machine panel to access the control board.

  5. Connect the 7-pin connector to the 7-pin male header on the machine control board. Route the harness behind the panel and pass the harness through the bulkhead hole into the coin box area. Pull the 16-pin connector through the large hole in the coin box vault that was previously drilled in step 2.

  6. Mount the Penny to P/N: 10-01303 using the provided #6 screws. It is helpful to plug in the 16-pin connector into the Penny before mounting.

  7. Combine P/N: 10-01302 and 10-01303 by sliding 10-01303 onto 10-01302 from the rear of the machine. Use the provided #6 screws and allen key to complete the assembly.

  8. Ensure the Penny is correctly mounted, and receives power. Reassemble the machine panel.

    Further Installation Steps

    Based on your machine type (ACA, Centurion, MDC, etc.), a specific guide is available that includes harness connections and machine programming. Please reference these guides for specifics.

Did this answer your question?